Download All Research Projects in JSON Format Project Name/ID Keyword Status - Any -ActiveCompletedProgrammedProposedTemporarily SuspendedTerminated Contact Laboratory - Any -Aerodynamics LaboratoryAggregate and Petrographic LaboratoryAsphalt Binder and Mixtures Laboratory (ABML)Chemistry LaboratoryCoatings and Corrosion LaboratoryConcrete LaboratoryFederal Outdoor Impact LaboratoryGeometric Design LaboratoryGeotechnical LaboratoryHuman Factors LaboratoryIntelligent Intersection Traffic Control LaboratoryJ. Sterling Jones Hydraulics Research LaboratoryNondestructive Evaluation (NDE) LaboratoryPavement Testing FacilitySafety Training and Analysis Center (STAC)Saxton Transportation Operations LaboratoryStructures Laboratory FHWA Program Area - Any -CorporateCross-TopicDesignated Grant ProgramsExploratory Advanced ResearchFederal and Indian LandsInfrastructureInnovative Program DeliveryIntelligent Transportation SystemsOperationsPlanning, Environment, and RealtyPolicySafetySmall Business Innovation Research FHWA AMRP Program - Any -Accelerated Implementation and Deployment of Pavement TechnologiesAdvanced Transportation and Congestion Management ProgramAutomation and ConnectivityCorporateExploratory Advanced ResearchPlanning for Bicycle and Pedestrian Safety, Connectivity, and Multimodal Mobility, including for Underserved CommunitiesPolicy Analysis and Global OutreachResearch Infrastructure, Technology Transfer, and PartnershipsSafety Program DeliverySmall Business Innovation ResearchState Transportation Innovation CouncilAccelerated Innovation DeploymentAdvanced Transp. and Congestion Management ProgramGeotechnical and HydraulicsHighway and Transportation DataModeling and Analysis ToolsSafety Design and OperationsSurface Transportation Funding AlternativesAccelerating Market ReadinessLong-Term Infrastructure Performance ProgramManaging Disruptions to OperationsPerformance Based PlanningSafety Data and AnalysisEvery Day CountsHuman Factors AnalyticsResiliencySurface Transp. Funding AlternativesTransportation Performance Management, Asset Management, and MaintenanceAccelerating Project DeliveryInnovative Program DeliveryStructuresTruck Size and WeightPavement and MaterialsTransportation Systems Management and OperationsDesignated Grant ProgramsFreight Management and OperationsHydraulicsConnected and Automated VehiclesGeotechnicalConstruction and Project ManagementCross-Topic Areas Federal and Indian LandsExploratory Advanced ResearchInfrastructureInnovative Program DeliveryOperationsPlanning, Environment, and RealtyPolicySafetySmall Business Innovation Research Activity - Any -Analysis, Modeling, and SimulationCARMACooperative Automated VehiclesData and AnalysisDevelopment of Crash Modification Factors ProgramEmergency ResponseEvaluation of Low Cost Safety Improvements Pooled Fund StudyFoundation Characterization Program (FCP)Geotechnology Research ProgramHighway Safety Improvement ProgramHighway Safety Information SystemHuman FactorsIntegrating Advanced Technologies to Actively Manage TrafficInteractive Highway Safety Design ModelIntersectionsLocal and Rural RoadsLong-Term Bridge PerformanceLong-Term Pavement PerformanceMotorcycle Crash Causation StudyNational Traffic and Road Closure InformationNaturalistic Driving Study Pooled FundPedestrian / BicycleReal-Time Traveler InformationRoadway DepartureRoadway Safety Capacity Building ProgramSafety Training and Analysis CenterSpeed ManagementSurrogate Safety Assessment Model (SSAM)Traffic Control Device Pooled FundTransportation ManagementUltra-High Performance Concrete (UHPC)Vehicle to Infrastructure Start Date Date E.g., 2021-06-21 End Date Date E.g., 2021-06-21 Project Name Project ID Status Start Date End Date Dimensional Stability of Prebagged Grouts for Prefabricated Bridge Element and System Connections FHWA-PROJ-13-0031 Active Monday, December 31, 2012 Saturday, November 29, 2014 Evaluation of Pedestrian Safety Engineering Countermeasures at Urban and Suburban Midblock Crossing Locations FHWA-PROJ-10-0044 Active Sunday, September 19, 2010 Tuesday, June 30, 2015 Next-Generation Traffic Management Systems: Concepts of Operations and Transitioning from Legacy System FHWA-PROJ-20-0001 Active Friday, November 1, 2019 Wednesday, December 1, 2021 Covered Bridge Preservation Research, Development, and Technology: Various Studies FHWA-PROJ-16-0051 Active Thursday, September 15, 2016 Monday, December 14, 2020 Traffic Management Center Pooled Fund Study - Task 2: Integration of Traffic Management Centers and Law Enforcement, Needs Assessment FHWA-PROJ-10-0035 Active Monday, August 2, 2010 Wednesday, August 1, 2012 Long-Term Pavement Performance Data Collection Activities, Southern Region 2012 FHWA-PROJ-12-0031 Active Sunday, January 1, 2012 Saturday, December 31, 2016 SI 15.5.4 Driving Simulator Assessment of Dynamic Lane Grouping at Signalized intersections FHWA-PROJ-16-0040 Active Sunday, February 21, 2016 Tuesday, October 27, 2020 Applications for the Environment: Real-Time Information Synthesis (AERIS) Evaluation Project FHWA-PROJ-11-0101 Active Monday, October 24, 2011 Friday, October 31, 2014 Performance-Based Classification Methods for Reclaimed Fly Ash FHWA-PROJ-19-0017 Active Wednesday, September 4, 2019 Sunday, September 3, 2023 Develop Solutions and Design Guidelines for Hydrological (Changes in Rainfall and Flood Frequency) Impacts on Highway Infrastructure II FHWA-PROJ-16-0053 Active Thursday, September 1, 2016 Monday, August 1, 2022 HRDO-FY16-09 Hardware in the Loop (HIL) Testing of Connected and Automated Vehicles (CAVs) I FHWA-PROJ-16-0025 Active Thursday, September 22, 2016 Thursday, October 29, 2020 Virtual Nondestructive Evaluation Laboratory for Highway Structures FHWA-PROJ-16-0005 Active Thursday, October 1, 2015 Wednesday, September 30, 2020 Harnessing Mobile Ad Hoc Networks to Improve Vulnerable Road User Safety FHWA-PROJ-19-0007 Active Monday, October 1, 2018 Friday, September 30, 2022 Field Evaluation of At-Grade Alternative Intersection Design FHWA-PROJ-16-0017 Active Sunday, September 25, 2016 Friday, September 24, 2021 Quick Incident Detection and Warning FHWA-PROJ-09-0040 Active Tuesday, September 1, 2009 Monday, September 30, 2013 HRDO-FY17-06 Use Cases & Concept of Operations to Enable Mobile Devices Sharing Data with Connected FHWA-PROJ-17-0015 Active Thursday, September 14, 2017 Wednesday, December 2, 2020 Multimodal Intelligent Traffic Signal System (MMITSS) Prototyping and Field Testing FHWA-PROJ-13-0069 Active Sunday, September 15, 2013 Friday, January 30, 2015 Increased Use of Sustainable Practices in Pavement Infrastructure: Full-scale Evaluation FHWA-PROJ-16-0033 Active Monday, March 21, 2016 Wednesday, December 16, 2020 Evaluation of Aesthetically Treated Crosswalks FHWA-PROJ-21-0006 Active Thursday, December 10, 2020 Thursday, December 10, 2020 CV Planning Tools FHWA-PROJ-14-0137 Active Wednesday, May 14, 2014 Thursday, November 19, 2020 Pages« first ‹ previous … 35 36 37 38 39 next › last »