Project Description
This project consists of pulverization and asphalt paving of 17.57 miles of existing two lane paved roadway from Peavine Ridge Road (MP 6.37) to the northern intersection of Wentworth Springs Road (MP 23.94).
Anticipated Timeline
Advertise: Winter 2023
Construction: Spring – Fall 2024